Angry Robot

The Pan Am Path: Proposal Unveiled for an 80-Kilometre Multi-Use Trail

Most of this trail is already there:

It is a trail system that already kind of exists in the city of Toronto, but is missing certain pieces that are required to make it a non-stop continuous path, and that’s what the path is about.

I’ve ridden most of this. Signage is a big issue, especially on the Humber side, which is a confusing mess. I’m pretty sure the Queen’s Quay work that is currently underway includes bike lanes (it’s supposed to be part of the Martin Goodman trail, after all).

• June 25, 2013, 10:35 pm |