Angry Robot

TTC looking if it can operate the Downtown Relief Line on GO’s Georgetown and Lakeshore East rails

Perhaps inspired by the Transport Action Ontario plan. The problems with using the Go corridor for the DRL: 1. it’s already in use for Go and freight, 2. Union Station already has capacity problems, 3. the Danforth connection would be quite far east (Main Station), therefore diverting fewer people from Bloor/Yonge.

• July 25, 2013, 4:15 pm |